Service & Support
List of FA Product Regular Training Courses: FY 2026-27

- Training
- FA Product Training
- Regular Product Training FY2026-27
- Customised Training FY2026-27
- Vertical Based Application Training FY2026-27
- Digitalization & Conversion Training FY2026-27
- Authorised Training Centre Calendar FY2026-27
- Training Request Form
- CNC Training
- Webinar
- CNC Training Calender: Year 2026-27
- CNC Training Request From
- CNC Webinar Calendar
List of FA Product Regular Training Courses: FY 2026-27
Following training courses are regularly offered from our all training Centres mentioned in previous section.
| Sr. No | Training Module | Days | Brief Courses |
| A. Product Trainings | |||
| 1 | iQ-F PLC | 2 Days | Introduction to iQ-F series PLC. Addressing. Programming using GXWorks3.Applied instructions, timer, counter, Analog. Structuredprogramming. FB |
| 2 | iQ-R PLC | 2 Days | Introduction to iQ-R series PLC.Compatibility in existing line. Lib. Functions, applied instructions, data labels, Analog interface, embedded data base. |
| 3 | MX-F Controller | 2 Days | Product Overview , Product Lineup ,Feature ,Application , Comparison between MXF &FX , Specification, Wiring, Addressing , Device memory , System Configuration , Software Requirement , Network Configuration , Motion Axis Configuration , Servo Ax. operation (JOG/HOME/Speed) ,Synchronous Control |
| 4 | MX-R Controller | 2 Days | Product Overview , Product Lineup ,Feature ,Application , Comparison between MXR &iQ-R , Specification, Wiring , , Addressing , Device memory , System Configuration , Software Requirement , TSN Network Configuration , Motion Axis Configuration , Servo Ax. operation (JOG/HOME/Speed) ,Synchronous Control |
| 5 | GOT 3000 | 2 Days | Product lineup & models, Hardware overview (GT37 wide, GT37 models), System architecture , Key features vs. GOT2000 differences , Applications in automation |
| 6 | CC-Link Control, IEF Basic, CC Li nk IEF, CC-Link IE TSN | 1 Day | Basics of CC-Link IE network. Introduction of CC-Link IE Field Basic & CC Link IE Field/TSN network components, topology. Network communication - Remote IO station & PLC to PLC configuration. diagnosis & troubleshooting |
| 7 | AC Drives | 2 Days | Basics of Inverter, Mitsubishi A800/E800 series Inverter. V/F control, jogging, parameter setting. Multispeed operation,CC-Link communication with FR800 |
| 8 | Servo I (Pulse Type) | 2 Days | Basics of servo systems, servo motor structures, Mitsubishi pulse type servo - MR JE. Servo parameter setting using MR configurator. Built in positioning using FX controller. Homing, positioning with Modbus protocol, troubleshooting |
| 9 | Servo II (SSCNet Based) Simple motion module Tr. | 2 Days | Mitsubishi's servo controller's range. SSCNet III/H based controller & amplifier - MR-J3 & MR J4. Positioning using QD77MH/RD77MH/77MS, M Code, QD77MS simple motion configurator, CAM design. |
| 10 | Servo (TSN Based MR-J5/JET-G)-Motion Module Tr. | 2 Days | Introduction to MR-J5/JET, Product Line-up (Amplifier & Motor),Specification, Peripheral device & Part identification, MR Configurator (Servo Parameter Setting ), One-touch tuning ,Test Operation, Positioning, Jogging, Homing |
| 11 | R Motion CPU | 2 Days | SSCNET based servo system MRJ4. Motion CPU: R16/32/64 MT CPU, SFC programming, Motion control with virtual mode. Mechanical editor |
| 12 | Genesis SCADA V10 | 2 Days | GENESIS64 Product Lineup, ICONICS Chart, System Configuration, Tag concept, , Workbench Overview- New Project, Backup, Restoration etc. Graph Worx -Object Creation, Properties etc. Alarm Worx, Trend Worx, Gridworks Viewer Different |
| 13 | Genesis SCADA V11 | 2 Days | Genesis64 V11 Overview, New installer, Client Specific Installation, FA Connector – Added functionality, Asset Builder FA,Data Historian & Alarm Server and Reports,Updated names of components,Alternatives for Obsolete components. |
| 14 | Robot-I (Basic) | 2 Days | Basics of robot( F/FR). Device configuration & wiring for external I/O. Robot operation & teaching. Programming with RT toolbox & teaching pendent. Robot applications & maintenance/ troubleshooting |
| 15 | Robot-II (Advance) | 2 Days | Basics of robot. Device configuration & wiring for external I/O. Robot operation, Spline Function, Tool teaching , Additional Axis function, Networking (CC-Link , CC-Link IE ) |
Mitsubishi FA Regular Product Training: Year 2026 - 27 Download Calendar
